PLC FAT and SAT checklist: test behavior and handover evidence
Plan factory and site acceptance around requirements, observable results, failure states, approved changes and recoverable project files.
Supervisory control, historians, alarming, and operations visualization.
Learning paths & worksheets: Industrial automation fundamentals · PLC FAT & SAT checklist template · OT backup & restore test template · OT reliability and security: inventory, segment and recover
Plan factory and site acceptance around requirements, observable results, failure states, approved changes and recoverable project files.
Inventory the files and dependencies needed to recover a control system, set recovery objectives, and test restoration on an isolated target.
Estimate raw historian volume, distinguish acquisition from storage filtering, and validate compression against the signals and events that matter.
Design SCADA systems that scale — field layer, communications, servers, redundancy, and alarming — without painting the project into a corner.
Build an OT incident response plan that respects process safety — roles, containment without shutdowns, backups that restore, and tested playbooks.
GOOSE messaging, sampled values, and SCL engineering — what IEC 61850 changes in substations and how to plan a migration from legacy RTUs.
Design HMIs operators can read at a glance — grayscale abnormality display, information hierarchy, and navigation that follows ISA-101.
Alarm rationalization, priorities, deadbands, shelving, and high-performance graphics for HMIs that support decisions instead of creating noise.
Asset hierarchy, units, quality, timestamps, metadata, and versioning patterns for process data that engineers can still understand years later.
Three systems that all "collect plant data" but answer different questions. Boundaries, handoffs, and how to stop buying two of them for one job.
How to divide a plant network into zones, control what crosses between them, and why flat OT networks keep making incident reports.
What distributed control is, how the two ABB flagships differ, and when a DCS beats a PLC/SCADA stack.
ISA's standards library, including ISA-95/IEC 62264 (enterprise–control integration), ISA-88 (batch), and ISA/IEC 62443 (OT security).
NIST SP 800-82 Rev. 3: the current federal guide to OT security — architecture, risk assessment, controls, and incident response for ICS.
Automation.com: industrial automation news, tutorials, and vendor coverage from the ISA-affiliated publication.
Shawn Tierney's long-running PLC and HMI tutorial site: reviews, training, and plain-spoken controls commentary.
Factory Software · PLCs · OT Cybersecurity · Industrial Networking · Industrial IoT / IIoT · Industrial Hardware