PLC FAT and SAT checklist: test behavior and handover evidence
Plan factory and site acceptance around requirements, observable results, failure states, approved changes and recoverable project files.
Relay-style graphical PLC language.
IEC 61131-3 graphical language that mimics relay ladder schematics: rungs of contacts and coils evaluated left to right, top to bottom. Still the most widely understood PLC language among maintenance electricians.
See also: IEC 61131-3 · PLC
Use the concept: 4–20 mA loop scaling · Industrial automation fundamentals · Modbus RTU CRC & frame helper
Plan factory and site acceptance around requirements, observable results, failure states, approved changes and recoverable project files.
Map raw counts into engineering units, check the configured channel range, and keep signal-quality diagnostics separate from the displayed value.
Inventory the files and dependencies needed to recover a control system, set recovery objectives, and test restoration on an isolated target.