PLC FAT and SAT checklist: test behavior and handover evidence
Plan factory and site acceptance around requirements, observable results, failure states, approved changes and recoverable project files.
Different on/off switching thresholds.
Gap between switch-on and switch-off points (start pump at 20%, stop at 80%) that stops rapid cycling. Implemented in logic, thermostats, pressure switches, and alarm blocks.
Use the concept: 4–20 mA loop scaling · Industrial automation fundamentals · Modbus RTU CRC & frame helper
Plan factory and site acceptance around requirements, observable results, failure states, approved changes and recoverable project files.
Map raw counts into engineering units, check the configured channel range, and keep signal-quality diagnostics separate from the displayed value.
Inventory the files and dependencies needed to recover a control system, set recovery objectives, and test restoration on an isolated target.