Gauge R&R: how much variation is the gauge?
A gauge R&R study separates measurement error from real part-to-part variation, so you can tell whether a tolerance decision is trustworthy.
The real place (shop floor).
Japanese for 'the real place': where value is created. Gemba walks take engineers and managers to the line to observe facts before deciding — the opposite of managing by dashboard alone.
See also: Kaizen · Andon system
Use the concept: Cp, Cpk, Pp & Ppk calculator · Downtime log template · MTBF, MTTR & availability calculator
A gauge R&R study separates measurement error from real part-to-part variation, so you can tell whether a tolerance decision is trustworthy.
A worked shift example separates customer pace, observed process speed and end-to-end delivery time, with practical checks before changing the line.
Use a time observation sheet to separate internal and external work, preserve safe setup steps, and verify a repeatable changeover improvement.