SMED changeover study: measure last good to first good
Use a time observation sheet to separate internal and external work, preserve safe setup steps, and verify a repeatable changeover improvement.
Switching a line or machine from one product to another.
The work and elapsed time required to switch a line, machine, recipe, tooling setup, or materials from one product to another. Shorter, repeatable changeovers increase available capacity and flexibility.